FEBRUARY 4, 2012– FEBRUARY 10, 2012
AIRSIDE CONSTRUCTION CLOSURES
Saturday February 4, 2012
- RWY 4L/22R (0700 – 1300L)
- RWY 13R/31L (2300 Fri – 0700L Sat)
- TWY FB btwn RWY 22R and TWY E (reopen @ 1500L)
- TWY ZA btwn TWY FB and C (reopen @ 1500L)
Sunday February 5, 2012
No RWY/TWY Construction
Monday February 6, 2012
- RWY 13R/31L (2300 Sun - 0700L Mon)
Tuesday February 7, 2012 to Wednesday 8, 2012
- RWY 13R/31L (2300 Mon - 0700L Tues)
- RWY 13R/31L (2300 Tues - 0700L Weds)
Tuesday February 7, 2012 to Friday February 10, 2012
- TWYs NA and NB btwn TWYs A and B (Nightly closures 2200 – 0600L)
- TWY B btwn TWYs NC and N (Nightly closures 2200-0600L)
Thursday February 9, 2012 to Wednesday February 14, 2012
- RWY 4L/22R and RWY 13R/31L - Nightly closures (0100 – 0500L)
UPCOMING AIRSIDE CONSTRUCTION
- Rehabilitation of TWY P: February 27th, 2012 – August 1st, 2012
- 24/7 Closure from February 27th, 2012 – June 1st, 2012 from east of TWY MC to east of TWY PD
- Rehabilitation of TWY R: Scheduled to commence work June 2012
- Rehabilitation of TWY C: Scheduled to commence work 3rd Quarter 2012
LANDSIDE CONSTRUCTION FEBUARY 4 – FEBRUARY 10
JFKE Water Meter Installation – Installation of a water meter on the outbound JFK Express BY PA Materials on Saturday, 2/4 requiring the closure of the right lane. Works hours 0745L – 1400L
JFKE Street Lighting Repairs – PA Maintenance will be repairing area street lighting on outbound JFK Expressway, Tuesday 2/7 – Wednesday 2/9, 0815L-1300L
Yellow Garage “Charging Point” Stations Installation – Monday thru Friday – Contractor will begin installation of 5 wall-mounted “Charging Point” stations for electric cars within the Yellow Garage on Level One. 0700L-1500L.
Terminal 5 – Arrivals Level –Door A1 & A2- Contractor will commence installation of the taxi line canopy Infill. During Installation, the taxi queuing (third row only) will close. Scheduled hours: 0700L-1500L,
Terminal 6 Demolition - Monday thru Friday - Contractor continue to prepare T6 for demolition. Tentative project completion TBD.
Delta Terminal 2, 3, 4 - Monday thru Friday - Contractor working in the Trailer Complex; & East and West Managers Lot at Terminal 4 installing the Head houses. Work hours – 0700L-1730L.
Back flow Prevention and Water Meter Upgrades, project will continue UFN.
- Monday thru Friday – Contractor will be working in the (A) grass area on 148th street and JFK Expressway exit ramp. Contractor will be excavating for the Lighting Vault # 6 project.
- Contractor will implement water meter upgrades at the following: (B)JFK Outbound ramp left lane closure, (C) Red lot north corner, (D) Single right lane closure outbound Van Wyck Expressway (the Bow Tie) and (E) Bow Tie in the Green Quadrant, (F) Green garage aisle 101 (12 spaces fence line) and (G) the exit plaza right shoulder grass area.
- Work hours -0700-1600L
South Cargo Road Bridge - Monday thru Friday - Contractor will be installing directional signage on South Cargo Road Bridge (Eastbound & Westbound): numerous single lane closures. Work hours- 0700-1500L.
Jamaica Water Pollution Control Project – DEP- Construction activities as it relates to the wastewater treatment plant. Right lane closure of 134th street between 150 Avenue and 155 Avenue.
Aqueduct Road & Bridge- Corrective maintenance to be performed that will require single lane closure in the westbound direction. Tentative start date 1/30/12 for one week
UPCOMING CONSTRUCTION
Air Train Shutdown – Air Train will shut down service at CTA and Howard Beach line, service will be continuing from Jamaica / Federal Circle. Bus Bridge will be in affect starting at 2100-0700L nightly. March 12 through April 30, 2012.
JCDecaux North America - Air Train connector (Station T2/3) Removal of exterior glass wall wrap. Schedule TBA.
VWE Broken Pipe Replacement - Replacement of a broken pipe 20ftx8ftx12ft which will require a two- lane closure on the Van Wyck Expressway adjacent to Term 4 parking lot 72 hours straight Start date TBA.
VWE Catch Basin Work – Van Wyck Expressway Catch Basin Preventative Maintenance- Single left lane closure inbound VWE. Upon completion, single left lane closure on the outbound Van Wyck Expressway. Schedule TBA
Perimeter Intrusion Detection System (PIDS) PM’s – Left and right lane closures on the underside of the Alpha Bridge Outbound JFK Expressway for the new RWIS. Schedule TBA.

AIRSIDE CONSTRUCTION CLOSURES
FEBRUARY 9, 2012– FEBRUARY 14, 2012
RUNWAY CONSTRUCTION CLOSURE
Thursday February 9, 2012 – Wednesday February 14, 2012
RWY 4L/22R and RWY 13R/31L - Nightly closures (0100 – 0500L)

JANUARY 28, 2012– FEBRUARY 3, 2012
Saturday January 28, 2012
- RWY 4L/22R (0700 – 1500L Sat)
- TWY K btwn RWY 4L/22R and TWY KA (UFN – 1800L Sat)
Sunday January 29, 2012
No RWY/TWY Construction
Monday January 30, 2012
- RWY 13R/31L (2300 Sun - 0700L Mon)
- TWY P btwn TWYs PA and PD (2300 Sun - 0700L Mon)
Tuesday January 31, 2012
- RWY 4L/22R (2300 Mon -0700L Tue)
Wednesday February 1 to Friday February 3, 2012
- RWY 13R/31L (Nightly closures 2300* – 0700)
- TWY P btwn PA and PF (Nightly closures 2300* – 0700)
- TWY B btwn TWYs NC and N (Nightly closures 2200*-0600)
- TWYs NA and NB btwn TWYs A and B (Nightly closures 2200*-0600)
*Nightly closures start Tuesday, Jan 31
UPCOMING AIRSIDE CONSTRUCTION
- Rehabilitation of TWY P: February 27th, 2012 – August 1st, 2012
- 24/7 Closure from February 27th, 2012 – June 1st, 2012 from east of TWY MC to east of TWY PD
- Rehabilitation of TWY R: Scheduled to commence work June 2012
- Rehabilitation of TWY C: Scheduled to commence work 3rd Quarter 2012
|
|
Due to emergency water main repairs, all traffic except taxis (CTB taxi access road not affected) is now detoured south to LaGuardia Rd. eastbound. Westbound traffic wishing to access the CTB lower level must exit the airport onto the main entrance road (service road alongside the GCP) and renter the airport at 94th St..
Access to the CTB upper level is not affected.
Please notify all those that may be affected by this work. We apologize for any inconvenience that this may
cause.
For further information, please contact Airport Operations at (718) 533-3700.

SATURDAY 2/4/12 - RWY 4/22 CLOSURE 06:00L until 14:00L
This morning’s Compu Weather forecast for today indicates sunny skies with temperatures in the mid 40’s. Friday night partly cloudy, low in the mid 30’s with winds from the NW. During the day on Saturday, we can expect mostly sunny skies with temperatures high in the mid 40’s and winds from the North at 5-10 MPH.
Based upon the forecast, a NOTAM has been issued to close RWY 4/22 on Saturday, February 4, 2012 from 06:00L until 17:00L for the following work:
- Electrical survey work along RWY 4/22
- PA Sign Shop personnel on duty for aeronautical painting issues
- PA Electrical personnel on duty for various electrical issues
- Monthly EMAS inspection RWY 4 end
Local TWY closure on TWY B between TWY E and approach of RWY 4 and TWY CY and RWY 4. TWY closures/requests will be coordinated with the ADM and
Air Traffic Control Tower.
OPSNET has been updated with construction advisory information
ROADWAY DETOUR AT THE 94TH STREET EXIT! PROJECT DURATION: ONE YEAR
Beginning on Thursday, January 13th, 2011 the NYS Department of Transportation (DOT) will begin detouring outbound LaGuardia Airport traffic onto a temporary, two-lane bridge at 94th Street. This work will allow the DOT to rebuild the west side of the existing bridge.
Inbound airport traffic will follow the current two lanes on the existing 94th Street bridge. This configuration will be in effect for approximately one year. Airport traffic should allow extra time to reach its destination.
Please notify all who may be inconvenienced by this work. We apologize for any delays this may cause.
For further information, please contact: Airport Operations at (718) 533-3700.

|